Project Background: ETSU Academic Building Commercial Drywall Framing and Finishing
In 2024, East Tennessee State University (ETSU) broke ground on its $62.5 million, 62,000-square-foot Academic Building in Johnson City, TN — a transformative addition that will house flexible classrooms, modern labs, and advanced learning spaces.
This large-scale project began in January 2024 and is on schedule for substantial completion by January 2026.
J Ross Painting & Drywall Commercial drywall division was selected to complete:
- Steel stud framing
- Drywall hanging and installation
- Taping and finishing
In this post, we’ll provide a behind-the-scenes look at the ETSU Academic Building drywall framing and finishing process — sharing key, behind-the-scenes looks from a commercial drywall contractor perspective.


What It Takes to Succeed on Higher-Education Construction Projects
Success on higher-education construction projects comes from strong coordination across trades and proactive planning. From the outset, the J Ross Painting & Drywall team worked closely with the project stakeholders to ensure:
- Preconstruction coordination and project phasing
- Advanced material procurement planning
- Sequencing of trades to maintain flow and schedule
- Proactive site inspections and readiness
- Clear daily communication and issue resolution
Materials Used in ETSU Academic Building Drywall Framing and Finishing
On a project of this size and complexity, selecting the right materials is key to durability and long-term performance. Below are some of the approximate material quantities used
- Approximately 1,300 drywall boards installed
- Approximately 78,000 drywall screws installed
- Approximately 23,000 Miles of drywall tape applied
- Approximately 650 gallons of joint compound used
- Steel framing — 30,000+ linear feet installed
- Fire-rated and high-impact assemblies as required


ETSU Academic Building Commercial Drywall Installation: Framing to Finishing
Steel Framing Scope
- Over 30,000 linear feet of steel stud framing
- Architectural soffits and complex ceiling systems
- Radius framing for atrium spaces
- Framing for advanced AV, mechanical, and MEP integrations
Drywall Hanging & Installation
- Mold-resistant drywall in wet areas
- High-impact drywall in corridors
- Fire-rated assemblies throughout egress paths and stairwells
- Extensive blocking for future AV installations
Taping & Finishing
- Level 4 and Level 5 finishes across all learning spaces
- Architectural feature walls and ceilings
- High-performance finishes for modern AV requirements
- Consistent quality control across all phases
As of June 2025, approximately 85% of drywall finishing is complete, with final punch work scheduled for later this summer.


What’s Next for the Project
- Final taping & finishing phases — Summer 2025
- AV and ceiling systems — Fall 2025
- Interior fit-out and final inspections — Winter 2025–2026
- Target completion — January 2026
Upon completion, the new ETSU Academic Building will provide a high-performance learning environment for the next generation of students.


Follow us on our socials, linked here:
Why Local Partnerships Matter
J Ross Painting & Drywall is a locally owned and operated company with deep roots in Northeast Tennessee.
This project reflects our commitment to quality, community, and collaboration — built by local professionals who take pride in shaping the future of ETSU and the region.